For UK builders, contractors and trades
RAMS and construction safety documents, written for your job
Send us the job details. We write the RAMS (risk assessment and method statement), construction phase plan or health and safety pack the main contractor is asking for, with your name on it, typically within 2 working days. Or use our free templates and guides.
- Written for the actual site
- Editable Word and PDF
- Changes made free if the site asks
method statement
Issued 14/10/2026
Review 14/01/2027
- Project
- Rear extension, 12 Example Road
- Task
- Strip foundations and blockwork to DPC
- Supervisor
- Site lead, CSCS Gold
- Plant
- 1.5 t excavator, cut-off saw (water fed)
- Permits
- Permit to dig, CAT & Genny scan
Free guides and templates
Every health and safety document a small construction firm gets asked for
Each guide explains what the law requires and what to include, with a free template you can download in Word or PDF. If you would rather not write it yourself, we can.
CDM 2015 paperwork
Risk assessments and RAMS
Hazardous substances and health
Electrical work
Policies, talks and accreditation
Asbestos
How it works
- Tell us about the jobFill in the order form: site, task, crew, tools and materials, and what the client asked for.
- We write itYour documents are written for that job, with your company details, not copied from another site.
- Brief and signYou get editable Word and PDF files with a briefing sheet for your crew to sign.
- Keep it currentIf the job changes or the site manager wants edits, we update it.
Prices
Construction phase plan
£49
CDM 2015 plan for a small or domestic project, ready to keep on site.
OrderStarter safety pack
£199
Health and safety policy, six general risk assessments, COSHH assessments for your products and 12 toolbox talks.
OrderMonthly plan
£29/month
Two new RAMS a month, unlimited updates to existing ones and a new toolbox talk every month. Cancel any time.
OrderSee all prices, including bundles and accreditation support
Frequently asked questions
What do you need from me?
The site address, what the job involves, who will be doing it, the tools and materials you'll use, and anything the client or main contractor has asked for. The order form takes about five minutes.
How quickly will I get my documents?
Typically within 2 working days of receiving your job details.
What format are the documents in?
Editable Word and PDF, with your company name on them and a briefing sheet for your crew to sign.
Will the main contractor accept them?
They are written for the specific job, which is what site managers look for. If a main contractor asks for changes, we make them at no extra cost.
Are your free templates good enough on their own?
They're a sound starting point if you fill them in properly for each job. If you'd rather not, we can write them for you.